a trip to north star apx 2016 long before the inland rail project
Silo at northstar where they would load grain trains.
This photos were taken back in about 2016
another view of the silos the staff hut where the crew would talk to train control to get instructions after loadinga smaller silo used to load trucks another view showing where the trucks unload from the farmslooking at the back of the loader for the trucks looking down the linewhere the single line spilts for the loader another view of a loader 759km from the end of platform 1 at sydney central this was the station sign that phil used on his spread sheet to mark off where he had been.
another view of the silos the staff hut where the crew would talk to train control to get instructions after loadinga smaller silo used to load trucks another view showing where the trucks unload from the farmslooking at the back of the loader for the trucks looking down the linewhere the single line spilts for the loader another view of a loader 759km from the end of platform 1 at sydney central this was the station sign that phil used on his spread sheet to mark off where he had been.
We knew he had used this with out asking if he could.
The photo has a tiny dirt mark on the lens so we knew it was mine.
Comments
Post a Comment